Axial 95

KBD Group is providing general contracting services for approximately 1.2 million SF three building package.

Wilkerson Mill

KBD Group is providing general contracting services for approximately 1.2 million SF three building package.

Toyo Tires Phase V

Toyo Tires Phase V

Manufacturing

PROJECT OVERVIEW
KBD Group provided Design-Build, for a 259,307 SF expansion to an existing mixing, tire preparation, tire building, tire curing, and warehouse areas. The expansion includes a Tire Prep Area, Tire Building (which includes a “Green Tire Mezzanine”), and Curing Area. This expansion also includes demo, concrete slabs, conventional steel, tilt up concrete walls, a PVC roof, and two (2) curing pits, and a 61,136 s.f. concrete Mixing Building Expansion. The mixing building includes drilled piers, elevated structural concrete construction. The 5,371 Test Building Expansion which consists of concrete slab on grade, masonry, conventional steel, and roof. The North Parking Lot expansion consists of asphalt, concrete curbs, and striping to add 154 additional spaces.

PROJECT PHOTOS

Tool-Flo

KBD Group provided Design and Construction services for this 118,000 SF machine and tooling facility.