UPS East Zone Regional Hub

The project consists of a main conveyor package Hub building, a 775,000 SF facility with 40’ varying roof heights for conveying systems and package car loading.

Trane Assembly Building

KBD Group provided design-build services for this 192,000 SF assembly building with 38 shipping and receiving docks that will produce Trane residential air conditioning units for Trane Technologies. The building has a connector corridor from new building to existing assembly plant.

Ball Aluminum Cup Facility

Ball Aluminum Cup Facility

Domestic – Manufacturing

Rome, GA

Location

PROJECT OVERVIEW
KBD Group provided Design-Build Services for this 249,182 SF new aluminum cups manufacturing facility located in Rome, GA. The facility was constructed to carbon neutral standards. It consists of a Tilt-up manufacturing building with a structural steel, an insulated metal panel wall system and lean-to style 13,714 SF office for the structure. The roof is based on TPO 60 mil roof system. Concrete package includes slabs, tilt up, process trenches, pits and foundations.