Burg Vinegar Jefferson

KBD Group provided design-build services for Burg Vinegar Jefferson, for a approximately 15,000 SF state-of-the-art manufacturing facility.

TOTO Expansion

KBD Group is currently providing design-build services for a three-story structural steel building with metal sidings with TPO roofing in the 15 Acre site.

Savannah Main Gate

KBD Group is providing general contracting services for two building packages of speculative warehouses totaling 545,521 SF

RRB T2 Expansion

KBD Group provided Design-Build and process installation services for a 465,000 SF expansion to Rauch/Red Bull’s existing …

Ecopol

Project Ocean | Ecopol

Manufacturing Under Construction

PROJECT OVERVIEW

KBD Group provided design-build services for a new 82,000 SF greenfield facility for a dissolvable film producing company. The facility will have production area, a warehouse space, and office & lab space. Scope will include an entire site package, concrete tilt walls, MEP, process utility connections. The manufacturing building will be the first built in the USA by Ecopol and will serve as their North American Headquarters.

PROJECT PHOTOS

American Fuji Seal

KBD Group provided Design-Build services for American Fuji Seal, a manufacturer of shrink-sleeve labels, self-adhesive labels, spouted pouches and packaging machinery. This manufacturing facility project involved 200,000 SF Tilt-up building with structural steel columns, joists and metal decking. Project also included a 60 Mil PVC roofing, some explosion relief panels, building plumbing, HVAC, and electrical.

Project Saphhire

Project Sapphire

Manufacturing

PROJECT OVERVIEW

KBD Group provided Design-Build services for this 544,500 SF Greenfield facility that will produce aluminum can lids for Ball Corporation. Project scope includes site work including process equipment installation, excavation, paving,  and site utilities along with concrete tilt up walls around the manufacturing and warehouse areas with office spaces. Our Mechanical, Electrical, and Plumbing (MEP) engineering team supported process equipment installation.

PROJECT PHOTOS

JX USA Groundbreaking Ceremony

On October 5th, JX Nippon Mining and Metals USA, Inc. (JX USA) celebrated a groundbreaking event for the construction of their new state-of-the-art electronic materials manufacturing plant.

MTMUS 250 – Interiors

Mazda Toyota 250 Central Office

Interiors

PROJECT OVERVIEW
KBD Group provided Design-Build services for a new 120,000 SF 3-story central administration building for Mazda-Toyota Manufacturing, U.S. (MTMUS), located in Huntsville, Alabama. The first floor consists of a kitchen, cafeteria, first aid facility, pharmacy and uniform shop sharing their use with the surrounding building complex. The second and third floor houses open space for general offices and employee restroom facilities.

Trane Assembly Building

KBD Group provided design-build services for this 192,000 SF assembly building with 38 shipping and receiving docks that will produce Trane residential air conditioning units for Trane Technologies. The building has a connector corridor from new building to existing assembly plant.

Henn na Hotel

Henn na Hotel

INTERIORS / Hotel / HOSPITALITY

PROJECT OVERVIEW
KBD Group provided Design-Build Services for this 17 floor hotel renovation at 235 West 35th Street. This unique, tech-forward hotel project entailed complete gut and renovation of this building with a double-height lobby with an animatronic T-Rex welcoming guests. All 92 guest rooms feature Japanese style soaking tubs and TOTO washlets, while the superior suites feature private balconies and LG Styler closets that steams and refreshens clothing. Other amenities include a guest lounge and a meeting room.
View Hotel's Website

Navigating Through Construction Material Shortages

When the COVID-19 pandemic hit, the United States construction industry experienced major supply chain disruptions. With the increase in housing shortages in the United States, several companies were left with the difficult decision to halt work on their projects. Amid the return to normal life

AWTX New Plant

KBD Group provided design-build services for this 1+ million SF manufacturing facility. The building consists of an automatic transmission building (AT Building) at 1 million SF which includes an 818,619 SF manufacturing area and a 199,433 SF two-story office, maintenance area, tool shop, and a cafeteria.

MTMUS 250

KBD Group provided Design-Build services for a new 120,000 SF 3-story central administration building for Mazda-Toyota Manufacturing, U.S. (MTMUS

Toyo Tires Phase V

Toyo Tires Phase V

PROJECT OVERVIEW
KBD Group provided Design-Build, for a 259,307 SF expansion to an existing mixing, tire preparation, tire building, tire curing, and warehouse areas. The expansion includes a Tire Prep Area, Tire Building (which includes a “Green Tire Mezzanine”), and Curing Area. This expansion also includes demo, concrete slabs, conventional steel, tilt up concrete walls, a PVC roof, and two (2) curing pits, and a 61,136 s.f. concrete Mixing Building Expansion. The mixing building includes drilled piers, elevated structural concrete construction. The 5,371 Test Building Expansion which consists of concrete slab on grade, masonry, conventional steel, and roof. The North Parking Lot expansion consists of asphalt, concrete curbs, and striping to add 154 additional spaces.

NHK Interiors

NHK New World Office

PROJECT OVERVIEW
KBD Group is proud to partner with NHK Japan Broadcasting Corp. to build their New World Office in New York. After careful planning, NHK leadership team decided to utilize 5,000 SF of additional space within the same facility. The Design-Build interior project will include a new studio room, studio control room, server room, pantry, general office space, editing room, reception area, two conference rooms, and equipment storage for the studio.
NHK WORLD-JAPAN is the international service of Japan’s public media organization NHK. It provides the latest information on Japan and Asia through television, radio, and online to a global audience.

FujiFilm

KBD Group provided Design-Build services for approximately 40 projects from 1988-2005 for Fujifilm.

Takasago Conversion

KBD Group provided Design and Construction services to Takasago corporation for the conversion of an existing warehouse to a manufacturing facility in Harriman, NY.

DNP Coater Line Phase I

KBD Group provided Design-Build services for this expansion and renovation of an existing DNP manufacturing facility in Concord NC, to accept a new coating line that was relocated from Dothan, AL.

NDK Crystal

KBD Group provided Design-Build services for the 54,877 SF manufacturing facility featuring an 80 ft tower to accommodate massive quartz processing equipment.

Marukan Vinegar Plant

BD Group provided Design-Build services for the construction of a 77,000 SF new single story Vinegar Brewery plant with an office, production, and warehouse.

Kubota Tractor Manufacturing Plant

KBD Group provided Design-Build services for a new 540,000 SF manufacturing plant with a two-story office, testing room, paint shop room, assembly line conveyer & paint line trench, bridge cranes, and hazardous material storage building.

Nichiha USA Manufacturing Facility

KBD Group provided Design-Build services for this, 413,300 SF cement fiberboard products manufacturing facility including an office building, a warehouse, a boiler building and a waste water treatment facility.

Sun Noodle

KBD Group provided Design-Build services for the Sun Noodle facility located in Carlstadt, NJ.

VSA Houston

KBD Group provided Design-Build services for a fully conditioned warehouse space and 7,800 SF office area. 

PFG Oakwood

KBD Group provided design/build service for this 175,000 square foot greenfield food service facility

Internap Atlanta Data Center Expansion

Internap Atlanta Data Center Expansion

Data Center

PROJECT OVERVIEW
KBD Group provided Design-Build services for the expansion of the Internap Atlanta data center, which is destined to become one of the largest multi-tenant data centers in the southeast. The scope of work included all design and planning for a phased build-out of an existing 40,000 SF office to become a 200 KW/SF data center. Included in this phase was over 12,000 SF of raised floor, new infrastructure rooms, dedicated new electrical and mechanical infrastructure and a shared generator farm as well as 14,000 SF of future data center space. Construction services included multiple road closures for the rigging and erecting of the transformers, air-cooled chillers and chilled water pumps. Design services included 3D modeling and CFD analysis.

Mizuho Bank

KBD Group provided Design-Build services for the restack of Mizuho Corporate Bank at 1251 Avenue of the Americas, New York, NY.