PROJECT OVERVIEW
KBD Group provided Design-Build services for this expansion and renovation of an existing DNP manufacturing facility in Concord NC, to accept a new coating line that was relocated from Dothan, AL. Scope included the relocation of printer system (printer, dryer) and mixing system (mixing tank, pump). The printer room is semi clean room, the mixing and storage room is H3 classification, and the mixing control panel room is mezzanine floor in the printer room. (2) 500RT Chiller, (3) 300HP boiler, (2) 15HP compressor, solvent tanks, and RTO.

PROJECT PHOTOS

Shopping Basket

BUILD WITH US!

Are you looking to start a project or need some questions answered?  Please complete the form and we will respond within 24 hours. We’re ready and eager to help walk you through the process. 