UPS Bourbon 3 HC Cold Storage

Warehouse/ Distribution

PROJECT OVERVIEW

KBD Group provided Design-Build services for
cold storage addition inside existing HC distribution
warehouse. Project scope includes 24,916 SF of
Cold Storage consisting of Cooler (5 deg C) and a
Freezer (-20 deg C ). Also, IMP walls and ceilings
at cold chambers with dry pendant sprinkler heads,
LED lighting, cold storage bi-parting doors, and
refrigeration design with redundancy. Freezer
requires insulated floor installation with electric
heating loop in mud slab.