UPS New Cut Center II - Cooler/Freezer

WAREHOUSE/ DISTRIBUTION

PROJECT OVERVIEW

KBD Group provided Design-Build services for cold storage addition inside existing HC distribution warehouse. Project scope includes 30,365 SF of Cold Storage consisting of 23,466 SF Cooler (5 deg C) and a 6,899 SF Freezer (-20 deg C ). Also, IMP walls and ceilings at cold chambers with dry pendant sprinkler heads, LED lighting, cold storage bi-parting doors, and refrigeration design with redundancy. Freezer requires insulated floor installation with electric heating loop in mud slab