XPO Logistics BTS

Food & Beverage Warehouse

PROJECT OVERVIEW
KBD Group provided Design-Build services for this 127,000 SF freezer/cooler warehouse facility for XPO Logistics’ frozen food distribution operation. Building construction includes Thermomas (R-30) concrete tilt wall exterior panels, 6” Insulated Metal Panel cold storage walls, Insulated and gylcol heated freezer slab, Kalman shrink compensated floor slabs and TPO Roof System. Refrigeration systems include (4) Industrial Freon (R-134A) Split Packaged Units with air cooled condensers and hot gas defrost evaporators. Freezer operating temperatures of -10 F with Cooler and Refrigerated Dock operating temperatures of 38 F. Facility includes a 2500A electrical service, electric fire pump, Dry-Air-Pac air compressor systems and QUELL Pre-Action sprinkler system using Ultra K-17 heads with linear heat detection.
Shopping Basket

BUILD WITH US!

Are you looking to start a project or need some questions answered?  Please complete the form and we will respond within 24 hours. We’re ready and eager to help walk you through the process. 

*Project Form