N. River Road Distribution Center

Under Construction

N. River Road Distribution Center

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided general contracting services for a 280,140 SF speculative warehouse distribution center in Douglasville, GA. This facility consists of site work and utilities, concrete tilt-up wall panels, conventional concrete slab, and a steel structure with a 36’ clear height. The building has a mechanically fastened TPO roof, 60 dock doors, 2 ramps with overhead doors, ESFR fire protection, 2 store fronts, and clerestory windows throughout the facility. The mechanical and electrical consist of exhaust fans and louvers, unit heaters for freeze protection, site lighting, and a 480/277 volt 2,000 Amp main electrical service. Site work consists of concrete paving, asphalt driveways, and landscaping.

Kennesaw 75 Distribution Center

Under Construction

Kennesaw 75 Distribution Center

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided design-build services for a 209,000 SF speculative three building package. All buildings are 28’ clear height rear load. Mechanically attached 45-mil TPO membrane.

Project Lake Groundbreaking

On April 6th, Tuesday morning, we were honored to stand with representatives to celebrate the groundbreaking ceremony of Spring Mountain Center’s future headquarters at Park 53 in Winder, GA.

The Edison Alpharetta

KBD Group provided General Contracting Services for this 104,000 SF speculative office building with common area and unattached clubhouse.

Buford Commerce Park

Speculative Warehouse

Buford Commerce Park

PROJECT OVERVIEW
KBD Group provided General Contracting services to four speculative buildings totaling 1,087,460 SF. Project scope included tilt-wall and steel structure, TPO roof, dock doors, storefront and paving. The extensive site work, retaining walls, and utilities is being managed with strict consideration of the property touching Lake Lanier and the Core of Engineers property line.

PROJECT PHOTOS

Clayton Commerce

Clayton Commerce Center II

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided general contracting services for a 365,000 SF speculative building. Project scope included site prep, tilt-wall and steel structure, TPO roof, dock doors, storefront and paving.

Toyo Tires Phase V

Toyo Tires Phase V

PROJECT OVERVIEW
KBD Group provided Design-Build, for a 259,307 SF expansion to an existing mixing, tire preparation, tire building, tire curing, and warehouse areas. The expansion includes a Tire Prep Area, Tire Building (which includes a “Green Tire Mezzanine”), and Curing Area. This expansion also includes demo, concrete slabs, conventional steel, tilt up concrete walls, a PVC roof, and two (2) curing pits, and a 61,136 s.f. concrete Mixing Building Expansion. The mixing building includes drilled piers, elevated structural concrete construction. The 5,371 Test Building Expansion which consists of concrete slab on grade, masonry, conventional steel, and roof. The North Parking Lot expansion consists of asphalt, concrete curbs, and striping to add 154 additional spaces.