Project Titan TI

KBD Group provided Design-Build services for a tenant build out that includes interior offices, restrooms, upgraded lighting and dock equipment.

Stonemont FM156

KBD Group provided general contracting services for 213,000 SF speculative warehouse on just over 11 and a half acres.

The Edison Alpharetta

KBD Group provided General Contracting Services for this 104,000 SF speculative office building with common area and unattached clubhouse.

Buford Commerce Park

Speculative Warehouse

Buford Commerce Park

PROJECT OVERVIEW
KBD Group provided General Contracting services to four speculative buildings totaling 1,087,460 SF. Project scope included tilt-wall and steel structure, TPO roof, dock doors, storefront and paving. The extensive site work, retaining walls, and utilities is being managed with strict consideration of the property touching Lake Lanier and the Core of Engineers property line.

PROJECT PHOTOS

Bourbon 1 Logistics Center

Bourbon 1 Logistics Center

WAREHOUSE | DISTRIBUTION

PROJECT OVERVIEW
KBD Group provided general contracting services for this 1.04 Million SF speculative distribution facility. The facility will be used as a massive COVID-19 vaccine distribution center in Shepherdsville, KY. The building features a 40’ clear height, typical bay size of 50’ x 56’ (56’ x 60’ bay in the staging area), 100 dock positions, 617 car parking (with electrical car charging station), 234 Trailer Parking, 4 drive in doors, ESFR fire protection, gas fired air rotation unit heaters in conjunction 80/20 pressurization heating units, (2) 3000 AMP electrical services, LED high bay and site lighting, and a 7” thick Ductilcrete floor slab. The building skin included poured on site tilt wall panels with Thermax insulation on the inside surface (R9.8), induction welded “Rhinobond” TPO roof (R20), aluminum windows with insulated glass.

Clayton Commerce

Clayton Commerce Center II

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided general contracting services for a 365,000 SF speculative building. Project scope included site prep, tilt-wall and steel structure, TPO roof, dock doors, storefront and paving.