KBD Group provided General Contracting services for this 754,822 SF speculative distribution facility with 40 foot clear height, tilt wall concrete exterior walls, R16 single ply mechanically attached TPO roof, 7 inch reinforced concrete floor slabs, and 188 dock positions. The building was heated with gas fired roof mounted make-up air units, while the fire protection system was an ESFR system complete with electric fire pump. The electrical system included a 2000Amp capacity service. Parking was provided for 207 trailers and 303 autos.
Are you looking to start a project or need some questions answered? Please complete the form and we will respond within 24 hours. We’re ready and eager to help walk you through the process.