Wintergreen

KBD Group provided General Contracting services for this 754,822 SF speculative distribution facility

Freudenberg Household Products Expansion

Freudenberg Household Products Expansion

Office / Warehouse

PROJECT OVERVIEW
KBD Group provided General Contracting services for the North American headquarters for Freudenberg Household Products. This project was a 100,000 SF expansion on an existing facility. This facility includes an office, a warehouse and production space, 45 dock locations, 30 trailer parking spaces, and 375 car parking spaces with 30’ clearance, ESFR sprinkler system, VAV Air Conditioning, and multiple electrical services. This expansion also received LEED certification.

PROJECT PHOTOS

Rock Run 9

Rock Run 9

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided general contracting services for this 242,515 SF speculative distribution facility with 32 foot clear height, insulated precast concrete exterior walls and R17 single ply mechanically attached TPO roof, 7 inch concrete floor slabs, and 40 dock positions. 80 double dome skylights were installed to allow natural light to enter the facility. The building was heated with gas fired roof mounted make-up air units, while the fire protection system was an ESFR system complete with electric fire pump. The electrical system included a 1600 amp capacity service plus a 100 amp house service. Parking was provided for 129 trailers and 218 autos. Project was awarded LEED Silver status by the USGBC. Upon leasing by the landlord, KBD was retained to complete required tenant improvements for a total of 3 various tenants.

Speedway Distribution Center Building B

Speedway Distribution Center Building B

Office / Warehouse

PROJECT OVERVIEW
KBD Group provided General Contracting services for this 672,678 SF warehouse/distribution building and office with a 32’ minimum clear height behind first girder line fin from loading docks. Construction consisted of tilt-up concrete wall panels, conventional steel framed roof using bar joists and joist girders, single ply TPO roofing. Building was heated and ventilated, included an ESFR sprinkler system and all associated concrete paving and driveways. Building was designed to accommodate multiple tenants.