KBD Group is currently providing design-build services for a three-story structural steel building with metal sidings with TPO roofing in the 15 Acre site.
American Fuji Seal
KBD Group provided Design-Build services for American Fuji Seal, a manufacturer of shrink-sleeve labels, self-adhesive labels, spouted pouches and packaging machinery. This manufacturing facility project involved 200,000 SF Tilt-up building with structural steel columns, joists and metal decking. Project also included a 60 Mil PVC roofing, some explosion relief panels, building plumbing, HVAC, and electrical.
UPS East Zone Regional Hub
The project consists of a main conveyor package Hub building, a 775,000 SF facility with 40’ varying roof heights for conveying systems and package car loading.
Perfect Plastics
KBD Group provided General Contracting Services for Perfect Plastic Printing’s Expansion project to support plastic card manufacturer serving financial institutions throughout the world.
Tool-Flo
KBD Group provided Design and Construction services for this 118,000 SF machine and tooling facility.
FujiFilm
KBD Group provided Design-Build services for approximately 40 projects from 1988-2005 for Fujifilm.
DNP Coater Line Phase I
KBD Group provided Design-Build services for this expansion and renovation of an existing DNP manufacturing facility in Concord NC, to accept a new coating line that was relocated from Dothan, AL.
Toppan Barrier Film Plant
KBD Group is providing Design-Build services for a barrier film manufacturing plant.
Kimoto Tech LC3 Renovation
KBD Group provided Design-Build services for the Kimoto Tech LC3 renovation project.