VSA Houston

KBD Group provided Design-Build services for a fully conditioned warehouse space and 7,800 SF office area.

UPS Pedricktown

KBD Group is providing general contracting services for approximately 1.2 million SF three building package.

Wilkerson Mill

KBD Group is providing general contracting services for approximately 1.2 million SF three building package.

RRB T2 Expansion

KBD Group provided Design-Build and process installation services for a 465,000 SF expansion to Rauch/Red Bull’s existing …

Project Ocean

Project Ocean | Ecopol

Manufacturing Under Construction

PROJECT OVERVIEW

KBD Group provided design-build services for a new 82,000 SF greenfield facility for a dissolvable film producing company. The facility will have production area, a warehouse space, and office & lab space. Scope will include an entire site package, concrete tilt walls, MEP, process utility connections. The manufacturing building will be the first built in the USA by Ecopol and will serve as their North American Headquarters.

PROJECT PHOTOS

American Fuji Seal

KBD Group provided Design-Build services for American Fuji Seal, a manufacturer of shrink-sleeve labels, self-adhesive labels, spouted pouches and packaging machinery. This manufacturing facility project involved 200,000 SF Tilt-up building with structural steel columns, joists and metal decking. Project also included a 60 Mil PVC roofing, some explosion relief panels, building plumbing, HVAC, and electrical.

UPS Northeast Regional Conveyor HUB

UPS Northeast Regional Conveyor HUB

Manufacturing

PROJECT OVERVIEW

The project consists of a main conveyor package Hub building, a 775,000 SF facility with 40’ varying roof heights for conveying systems and package car loading.  Inside the main Hub includes approximately 58,000 SF of one and two-story office complexes. Building is constructed with tilt wall concrete panels and a TPO roof system. Includes (92) input dock doors, (328) outbound doors, and (6) drive in doors for the egress of (126) package cars.

The main Hub facility is designed to ship approximately 80,000 packages per hour in peak operation. Automated conveyor systems sort packages between and 16 – 20 hours a day. In peak season they will be able to ship over 2 million packages a day! This is the 4th largest regional package conveyor Hub ever built for UPS.

Additional support buildings include an approximately 28,000 SF Auto repair facility to accommodate maintenance and repairs for (3) package car bays, (17) tractor bays and (9) trailer repair bays. Two Employee Entrance and Security facilities and 3,300 SF Retail & Customer Service Center.

The following site improvements were completed:

  • – 69kV Main Electrical Substation installation to feed (6) 12.47kV unit substations inside the main Hub Building & Auto Shop

– Two Diesel / Gas & CNG Fueling Islands with above ground fuels storage tanks

– Fire Pump Building

– Pre-Fab Guard Shack

– Salt Storage Shelter

– One truck wash facility – 2 lane wash tunnel

– 192 acre site improvements including paving for approximately (750) 53’ trailers, (300) 28’ trailer staging, (260) tractor staging positions, (10) package car positions and approximately (1800) employee parking positions

Park Lake

Park Lake Distribution Center

PROJECT OVERVIEW
KBD Group provided design-build services for this 273,588 SF building for Noviland. Scope includes a 45 dock doors, an ESFR High Pressure System, gas heating system, and a 39.5 foot ceiling height. The roof type is a 45 mil PLY TPO membrane system, and the interior lighting includes a led high bay with standard efficiency 360 integral motion sensor.