Wintergreen

KBD Group provided General Contracting services for this 754,822 SF speculative distribution facility

PFG Oakwood

KBD Group provided design/build service for this 175,000 square foot greenfield food service facility

XPO Logistics BTS

XPO Logistics BTS

Food & Beverage Warehouse

PROJECT OVERVIEW
KBD Group provided Design-Build services for this 127,000 SF freezer/cooler warehouse facility for XPO Logistics’ frozen food distribution operation. Building construction includes Thermomas (R-30) concrete tilt wall exterior panels, 6” Insulated Metal Panel cold storage walls, Insulated and gylcol heated freezer slab, Kalman shrink compensated floor slabs and TPO Roof System. Refrigeration systems include (4) Industrial Freon (R-134A) Split Packaged Units with air cooled condensers and hot gas defrost evaporators. Freezer operating temperatures of -10 F with Cooler and Refrigerated Dock operating temperatures of 38 F. Facility includes a 2500A electrical service, electric fire pump, Dry-Air-Pac air compressor systems and QUELL Pre-Action sprinkler system using Ultra K-17 heads with linear heat detection.

PROJECT PHOTOS

Freudenberg Household Products Expansion

Freudenberg Household Products Expansion

Office / Warehouse

PROJECT OVERVIEW
KBD Group provided General Contracting services for the North American headquarters for Freudenberg Household Products. This project was a 100,000 SF expansion on an existing facility. This facility includes an office, a warehouse and production space, 45 dock locations, 30 trailer parking spaces, and 375 car parking spaces with 30’ clearance, ESFR sprinkler system, VAV Air Conditioning, and multiple electrical services. This expansion also received LEED certification.

Rock Run 9

Rock Run 9

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided general contracting services for this 242,515 SF speculative distribution facility with 32 foot clear height, insulated precast concrete exterior walls and R17 single ply mechanically attached TPO roof, 7 inch concrete floor slabs, and 40 dock positions. 80 double dome skylights were installed to allow natural light to enter the facility. The building was heated with gas fired roof mounted make-up air units, while the fire protection system was an ESFR system complete with electric fire pump. The electrical system included a 1600 amp capacity service plus a 100 amp house service. Parking was provided for 129 trailers and 218 autos. Project was awarded LEED Silver status by the USGBC. Upon leasing by the landlord, KBD was retained to complete required tenant improvements for a total of 3 various tenants.