Kennesaw 75 Distribution Center

Under Construction

Kennesaw 75 Distribution Center

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided design-build services for a 209,000 SF speculative three building package. All buildings are 28’ clear height rear load. Mechanically attached 45-mil TPO membrane.

Project Lake Groundbreaking

On April 6th, Tuesday morning, we were honored to stand with representatives to celebrate the groundbreaking ceremony of Spring Mountain Center’s future headquarters at Park 53 in Winder, GA.

Perfect Plastics

Under Construction

Perfect Plastics Expansion

Credit Card Manufacturing Facility

PROJECT OVERVIEW
KBD Group is providing General Contracting Services for Perfect Plastic Printing’s Expansion project to support plastic card manufacturer serving financial institutions throughout the world. The building is being constructed with insulated load bearing precast concrete exterior building walls, structural steel framing and a TPO roof system. Building aesthetic enhancements will include glazed aluminum entrance systems complimenting the composite metal and glass building canopies and punched window units. Building features include LED lighting and associated lighting control system; one (1) new 1,600amp electrical service and a 350kW generator; DuctileCrete floor slabs; 6000 SF security vault structure; fire protection systems; two (2) dock positions, and solar wall panels; Site improvements include on site storm water detention and 170 car parking incorporating permeables. Interior spaces include approximately 8,400 SF of Class ‘A’ office area; 31,300 SF of air conditioned and humidified process area; and 10,500 SF of assembly and warehouse area.

The Edison Alpharetta

KBD Group provided General Contracting Services for this 104,000 SF speculative office building with common area and unattached clubhouse.

AWTX New Plant

KBD Group provided design-build services for this 1+ million SF manufacturing facility. The building consists of an automatic transmission building (AT Building) at 1 million SF which includes an 818,619 SF manufacturing area and a 199,433 SF two-story office, maintenance area, tool shop, and a cafeteria.

Last Mile Logistics Center

Last Mile Logistics Center

Speculative Warehouse

PROJECT OVERVIEW
KBD provided general contracting services for a 283,820 SF speculative distribution facility. This project was located on a 16.1-acre site, previously occupied by a golf driving range and clubhouse, which KBD demolished prior to the start of construction. The building features 36’ clear height, typical bay size of 55’ x 56’ (56’ x 60’ bay in the staging area), 49 dock positions, 162 car parking (with electrical car charging stations), 2 drive in doors, ESFR fire protection, gas fired air rotation unit heaters, 1600 Amp electrical service, LED high bay and site lighting, and a 7” thick floor slab. The building skin includes insulated precast concrete wall panels (R14), induction welded “Rhinobond” TPO roof (R16), aluminum windows with insulated glass. Also, a 4200 SF office was constructed to allow the facility to be available for immediate occupancy.

Buford Commerce Park

Speculative Warehouse

Buford Commerce Park

PROJECT OVERVIEW
KBD Group provided General Contracting services to four speculative buildings totaling 1,087,460 SF. Project scope included tilt-wall and steel structure, TPO roof, dock doors, storefront and paving. The extensive site work, retaining walls, and utilities is being managed with strict consideration of the property touching Lake Lanier and the Core of Engineers property line.