Minamoto Kitchoan

KBD Group provided General Contracting services for the 2,500 SF tenant improvement of a high-end confectionary store.

Savannah Main Gate

KBD Group is providing general contracting services for two building packages of speculative warehouses totaling 545,521 SF

Vitesco Expansion

KBD Group provided General Contracting services for this 40,000 SF expansion to existing warehouse storage
facility. The facility will be utilized for receiving bulk storage of mechanical materials.

UPS Pedricktown

KBD Group is providing general contracting services for approximately 1.2 million SF three building package.

AXIAL Gateway 95

KBD Group provided general contracting services for AXIAL Gateway 95 by Crescent Communities, a 505,000 SF speculative warehouse facility that exemplifies modern construction and innovation.

Wilkerson Mill

KBD Group is providing general contracting services for approximately 1.2 million SF three building package.

Beauflor – Interiors

Beauflor Flooring Plant

Interiors

PROJECT OVERVIEW
KBD Group provided General Contracting services for a 325,163 SF Cushioned Vinyl Flooring manufacturing plant and 220,946 SF warehouse building located on a 167 acre campus in Bartow County, GA. Features of the facility include tilt wall panel construction, TPO roof system, and an 88’ wide crane that services the entire length of the production hall.

Beauflor

Beauflor Flooring Plant

Manufacturing

PROJECT OVERVIEW
KBD Group provided General Contracting services for a 325,163 SF Cushioned Vinyl Flooring manufacturing plant and 220,946 SF warehouse building located on a 167 acre campus in Bartow County, GA. Features of the facility include tilt wall panel construction, TPO roof system, and an 88’ wide crane that services the entire length of the production hall.

Stonemont FM156

Stonemont FM156

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided general contracting services for 213,000 SF speculative warehouse on just over 11 and a half acres. Full site packages are to be included in the effort. This project was designed by a local Texas firm RGA architects and will serve as both a warehouse as well as office space for its tenants.

Navigating Through Construction Material Shortages

When the COVID-19 pandemic hit, the United States construction industry experienced major supply chain disruptions. With the increase in housing shortages in the United States, several companies were left with the difficult decision to halt work on their projects. Amid the return to normal life

The Edison Alpharetta

KBD Group provided General Contracting Services for this 104,000 SF speculative office building with common area and unattached clubhouse.

Last Mile Logistics Center

Last Mile Logistics Center

Speculative Warehouse

PROJECT OVERVIEW
KBD provided general contracting services for a 283,820 SF speculative distribution facility. This project was located on a 16.1-acre site, previously occupied by a golf driving range and clubhouse, which KBD demolished prior to the start of construction. The building features 36’ clear height, typical bay size of 55’ x 56’ (56’ x 60’ bay in the staging area), 49 dock positions, 162 car parking (with electrical car charging stations), 2 drive in doors, ESFR fire protection, gas fired air rotation unit heaters, 1600 Amp electrical service, LED high bay and site lighting, and a 7” thick floor slab. The building skin includes insulated precast concrete wall panels (R14), induction welded “Rhinobond” TPO roof (R16), aluminum windows with insulated glass. Also, a 4200 SF office was constructed to allow the facility to be available for immediate occupancy.

Buford Commerce Park

Speculative Warehouse

Buford Commerce Park

PROJECT OVERVIEW
KBD Group provided General Contracting services to four speculative buildings totaling 1,087,460 SF. Project scope included tilt-wall and steel structure, TPO roof, dock doors, storefront and paving. The extensive site work, retaining walls, and utilities is being managed with strict consideration of the property touching Lake Lanier and the Core of Engineers property line.

PROJECT PHOTOS

Bourbon 1 Logistics Center

Bourbon 1 Logistics Center

WAREHOUSE | DISTRIBUTION

PROJECT OVERVIEW
KBD Group provided general contracting services for this 1.04 Million SF speculative distribution facility. The facility will be used as a massive COVID-19 vaccine distribution center in Shepherdsville, KY. The building features a 40’ clear height, typical bay size of 50’ x 56’ (56’ x 60’ bay in the staging area), 100 dock positions, 617 car parking (with electrical car charging station), 234 Trailer Parking, 4 drive in doors, ESFR fire protection, gas fired air rotation unit heaters in conjunction 80/20 pressurization heating units, (2) 3000 AMP electrical services, LED high bay and site lighting, and a 7” thick Ductilcrete floor slab. The building skin included poured on site tilt wall panels with Thermax insulation on the inside surface (R9.8), induction welded “Rhinobond” TPO roof (R20), aluminum windows with insulated glass.

95 Christopher Lobby Renovation

95 Columbus Lobby Renovation

  • 95 Columbus
PROJECT OVERVIEW
KBDG provided GC services for an active lobby gut and renovation project at 95 Columbus Drive in Jersey City. Keeping the lobby access safe and available for occupants throughout the project requires multiple phases carefully coordinated with the tenants and building management. Work entails demolition of existing stone flooring and walls and replacing with new finishes, construction of new common area bathrooms and fitness center, exterior site work and new glass entry vestibule.

Clayton Commerce

Clayton Commerce Center II

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided general contracting services for a 365,000 SF speculative building. Project scope included site prep, tilt-wall and steel structure, TPO roof, dock doors, storefront and paving.

75 Logistics

UNDER CONSTRUCTION

75 Logistics

WAREHOUSE | DISTRIBUTION

PROJECT OVERVIEW
KBD Group is providing general contracting services for a 630,368 SF speculative distribution facility. This project is located on a 54.3-acre site with 60 feet of elevation changes. The building will feature 40’ clear height, typical bay size of 50’ x 56’ (56’ x 60’ bay in the staging area), 62 dock positions, 432 car parking (with electrical car charging station), 118 Trailer parking spots, 2 drive in doors, ESFR fire protection system supported by a 160,000 gallon water storage tank and 2500 GPM diesel fire pump, gas fired air rotation unit heaters in conjunction with 80/20 pressurization make up air units, (2) 3000Amp electrical services, LED high bay and site lighting, and a “Heidebed” Ductilcrete floor slab system that consisted of 3” topping over a 4” base slab. The building skin includes tilt up concrete wall panels with Thermax insulation (R9.8), induction welded “Rhinobond” TPO roof (R20), aluminum windows with insulated glass.

Ball Aluminum Cup Facility

Ball Aluminum Cup Facility

Domestic – Manufacturing

Rome, GA

Location

PROJECT OVERVIEW
KBD Group provided Design-Build Services for this 249,182 SF new aluminum cups manufacturing facility located in Rome, GA. The facility was constructed to carbon neutral standards. It consists of a Tilt-up manufacturing building with a structural steel, an insulated metal panel wall system and lean-to style 13,714 SF office for the structure. The roof is based on TPO 60 mil roof system. Concrete package includes slabs, tilt up, process trenches, pits and foundations.

Fulton Industrial Complex

Fulton Industrial Complex

Office / Interiors / Education

CHI-1970-Fulton_0034_5_6

Project Overview

KBD Group provided exceptional General Contracting services for three impressive warehouse buildings, with a combined total of 882,070 square feet. The spec package for these buildings was comprehensive, featuring tilt-wall and steel structure construction, TPO roof installation, dock doors, storefront, and paving. The buildings were built to the highest industry standards and designed to meet the unique needs of the clients.

Building sizes:

    • Building 1: 302,870 SF
    • Building 2: 364,200 SF
    • Building 3: 215,000 SF
    • Total: 882,070 SF

With KBD Group’s expertise and unwavering commitment to quality, the project was completed successfully and on time, resulting in state-of-the-art facilities that meet the highest standards of functionality and durability.

Desoto Facilities A2, C, and D

Desoto 55 Building A2, Building C, and Building D

WAREHOUSE | DISTRIBUTION

PROJECT OVERVIEW
KBD provided general contracting services for three speculative distribution facilities constructed concurrently totaling over 1.5 million square feet. The buildings ranged in size from 317,000 to 861,000SF with clear heights ranging from 28’ to 33’. Typical bay sizes are 56’ x 50’ (56’ x 60’ bay in the staging area). The buildings included 281 dock and 8 drive-in doors, 745 car and 254 trailer parking, ESFR fire protection, gas-fired 80/20 pressurization heating units, 2 electrical services per building, LED high bay (with motion and dimming sensors) and site lighting, and 6” thick Ductilcrete floor slabs. The building skins included poured on-site tilt-wall concrete wall panels, induction welded “Rhinobond” TPO roof (R19), and aluminum windows with insulated glass.

100 Enterprise Drive

100 Enterprise Drive

Office / Interiors

PROJECT OVERVIEW
KBD Group provided General Contracting Services on this building amenity improvement project in Rockaway, New Jersey. 100 Enterprise Drive is a 7-story suburban office building located 30-miles west of NYC. The project involves selective demolition, lobby renovations for both upper and lower lobbies, new café space, a new gym facility, a golf simulator, build out of an office spec space, a public bathroom and elevator lobby renovations for all 7-floors.

Mitsui & Co. MetLife Building

KBD Group provided General Contracting services for this build-out of two full floor midtown office interior space totaling 60,000 RSF, on the 35th and 36th floors of the MetLife building in New York City.

Colgate

Our scope included 14,000 SF of office build out (broken up into 4 separate offices).

Riverside A

KBD Group provided General Contracting services tor this 653,484 SF concrete tilt panel shell with 127 dock doors and 4 drive in doors.

Fujifilm USA

KBD Group provided General Contracting services for this three-story, 331,000 SF build-to-suit office and industrial facility.

Jupiter Trade Center

KBD Group provided General Contracting services for a 472,244 SF tilt panel and structural frame shell warehouse, including sitework on a greenfield site.

IDI Hamilton Mill N

KBD Group provided General Contracting Services for this 912,522 SF Speculative Distribution Center located in Indianapolis, IN.

IDI Jefferson C

KBD Group provided General Contracting services for a 924,840 SF tilt panel warehouse with Ductilcrete slab.

Interstate West

KBD Group provided Design-Build services for a 55 acre site with a 762,253 SF speculative tilt-up warehouse

IDI Ameriplex 4

KBD Group provided General Contracting Services for this 912,522 SF Speculative Distribution Center located in Indianapolis, IN.

Wintergreen

KBD Group provided General Contracting services for this 754,822 SF speculative distribution facility

Freudenberg Household Products Expansion

Freudenberg Household Products Expansion

Office / Warehouse

PROJECT OVERVIEW
KBD Group provided General Contracting services for the North American headquarters for Freudenberg Household Products. This project was a 100,000 SF expansion on an existing facility. This facility includes an office, a warehouse and production space, 45 dock locations, 30 trailer parking spaces, and 375 car parking spaces with 30’ clearance, ESFR sprinkler system, VAV Air Conditioning, and multiple electrical services. This expansion also received LEED certification.

Rock Run 9

Rock Run 9

Speculative Warehouse

PROJECT OVERVIEW
KBD Group provided general contracting services for this 242,515 SF speculative distribution facility with 32 foot clear height, insulated precast concrete exterior walls and R17 single ply mechanically attached TPO roof, 7 inch concrete floor slabs, and 40 dock positions. 80 double dome skylights were installed to allow natural light to enter the facility. The building was heated with gas fired roof mounted make-up air units, while the fire protection system was an ESFR system complete with electric fire pump. The electrical system included a 1600 amp capacity service plus a 100 amp house service. Parking was provided for 129 trailers and 218 autos. Project was awarded LEED Silver status by the USGBC. Upon leasing by the landlord, KBD was retained to complete required tenant improvements for a total of 3 various tenants.

Speedway Distribution Center Building B

Speedway Distribution Center Building B

Office / Warehouse

PROJECT OVERVIEW
KBD Group provided General Contracting services for this 672,678 SF warehouse/distribution building and office with a 32’ minimum clear height behind first girder line fin from loading docks. Construction consisted of tilt-up concrete wall panels, conventional steel framed roof using bar joists and joist girders, single ply TPO roofing. Building was heated and ventilated, included an ESFR sprinkler system and all associated concrete paving and driveways. Building was designed to accommodate multiple tenants.

VSA Houston

KBD Group provided Design-Build services for a fully conditioned warehouse space and 7,800 SF office area.

CNBC Global Headquarters

KBD Group provided General Contracting services for the 355,000 square foot, 3 story building to house the corporate offices and state of the art broadcasting studio and technical facility.