American Fuji Seal

KBD Group provided Design-Build services for American Fuji Seal, a manufacturer of shrink-sleeve labels, self-adhesive labels, spouted pouches and packaging machinery. This manufacturing facility project involved 200,000 SF Tilt-up building with structural steel columns, joists and metal decking. Project also included a 60 Mil PVC roofing, some explosion relief panels, building plumbing, HVAC, and electrical.

UPS Northeast Regional Conveyor HUB

The project consists of a main conveyor package Hub building, a 775,000 SF facility with 40’ varying roof heights for conveying systems and package car loading. Inside the main Hub includes approximately 58,000 SF of one and two-story office complexes. Building is constructed with tilt wall concrete panels and a TPO roof system.

Project Saphhire

Project Sapphire

Manufacturing

PROJECT OVERVIEW

KBD Group provided Design-Build services for this 544,500 SF Greenfield facility that will produce aluminum can lids for Ball Corporation. Project scope includes site work including process equipment installation, excavation, paving,  and site utilities along with concrete tilt up walls around the manufacturing and warehouse areas with office spaces. Our Mechanical, Electrical, and Plumbing (MEP) engineering team supported process equipment installation.

PROJECT PHOTOS

JX USA Groundbreaking Ceremony

On October 5th, JX Nippon Mining and Metals USA, Inc. (JX USA) celebrated a groundbreaking event for the construction of their new state-of-the-art electronic materials manufacturing plant.

Beauflor

Beauflor Flooring Plant

Manufacturing

PROJECT OVERVIEW
KBD Group provided General Contracting services for a 325,163 SF Cushioned Vinyl Flooring manufacturing plant and 220,946 SF warehouse building located on a 167 acre campus in Bartow County, GA. Features of the facility include tilt wall panel construction, TPO roof system, and an 88’ wide crane that services the entire length of the production hall.

Trane Assembly Building

KBD Group provided design-build services for this 192,000 SF assembly building with 38 shipping and receiving docks that will produce Trane residential air conditioning units for Trane Technologies. The building has a connector corridor from new building to existing assembly plant.

Perfect Plastics

Under Construction

Perfect Plastics Expansion

Credit Card Manufacturing Facility

PROJECT OVERVIEW
KBD Group is providing General Contracting Services for Perfect Plastic Printing’s Expansion project to support plastic card manufacturer serving financial institutions throughout the world. The building is being constructed with insulated load bearing precast concrete exterior building walls, structural steel framing and a TPO roof system. Building aesthetic enhancements will include glazed aluminum entrance systems complimenting the composite metal and glass building canopies and punched window units. Building features include LED lighting and associated lighting control system; one (1) new 1,600amp electrical service and a 350kW generator; DuctileCrete floor slabs; 6000 SF security vault structure; fire protection systems; two (2) dock positions, and solar wall panels; Site improvements include on site storm water detention and 170 car parking incorporating permeables. Interior spaces include approximately 8,400 SF of Class ‘A’ office area; 31,300 SF of air conditioned and humidified process area; and 10,500 SF of assembly and warehouse area.

AISIN North America Plant

KBD Group provided design-build services for this 1+ million SF manufacturing facility. The building consists of an automatic transmission building (AT Building) at 1 million SF which includes an 818,619 SF manufacturing area and a 199,433 SF two-story office, maintenance area, tool shop, and a cafeteria.

MTMUS 250

Mazda Toyota 250 Central Office

Manufacturing

PROJECT OVERVIEW
KBD Group provided Design-Build services for a new 120,000 SF 3-story central administration building for Mazda-Toyota Manufacturing, U.S. (MTMUS), located in Huntsville, Alabama. The first floor consists of a kitchen, cafeteria, first aid facility, pharmacy and uniform shop sharing their use with the surrounding building complex. The second and third floor houses open space for general offices and employee restroom facilities.

Toyo Tires Phase V

Toyo Tires Phase V

Manufacturing

PROJECT OVERVIEW
KBD Group provided Design-Build, for a 259,307 SF expansion to an existing mixing, tire preparation, tire building, tire curing, and warehouse areas. The expansion includes a Tire Prep Area, Tire Building (which includes a “Green Tire Mezzanine”), and Curing Area. This expansion also includes demo, concrete slabs, conventional steel, tilt up concrete walls, a PVC roof, and two (2) curing pits, and a 61,136 s.f. concrete Mixing Building Expansion. The mixing building includes drilled piers, elevated structural concrete construction. The 5,371 Test Building Expansion which consists of concrete slab on grade, masonry, conventional steel, and roof. The North Parking Lot expansion consists of asphalt, concrete curbs, and striping to add 154 additional spaces.